PREVENTIVE MAINTENANCE
IN THE EVAPORATOR
• Coil cleaning.
• Electric board.
• Interior and exterior cabinet.
• Adjustment of electrical connections.
• Review of parameters such as voltage, current, refrigerant pressure.
• Engine check.
• Adjustment of bands and bearings.
IN THE CONDENSER
•Coil cleaning (with pressurized water)
• Cleaning of electrical panel.
• Adjustment of connections.
• Engine and blade inspection.
WORKS INCLUDE
• Labour.
• Tools.
• Application of special product for cleaning coils every 6 months.
• Change pleated air filters (2 per year).
• Emergency response in less than 3 hours, 24 hours a day, 365 days a year.
BASIC SPARE PARTS KIT (SUPPLIES PER YEAR)
• Transmission bands.
• Change of fuses (as necessary).
• 13.6 kg R-22 refrigerant gas tank.